How to prepare for D2-Commissioning testing?
![Ship D2 Commissioning VPC Ship D2 Commissioning VPC](https://www.controlunion.com/wp-content/uploads/2023/09/ship-6580994_1920.jpg)
Commissioning Testing validates the installation of the BWTS by demonstrating that its mechanical, physical, chemical and biological processes are working correctly – as per the design specifications or so-called Type Approval. If your ship(s) uses a Ballast Water Treatment System (BWTS) you must comply with international regulations for ballast water management, including conducting a Commissioning Test on your newly installed BWTS. But how to prepare for that?